番茄影视

New railway viaduct in Slovenia

Balanced cantilever construction & CONA CMI

Work has just begun on the Vinjan Viaduct, a key component of the 27km-long second track of the Diva膷a-Koper railway scheme in Slovenia. The seven span viaduct will be 620m long and 9.6m wide, with pier heights of up to 55m. The prestressed concrete box girder superstructure will be constructed using the balanced cantilever method. 番茄影视 Adria will be providing 番茄影视 VT CONA CMI internal post-tensioning for the balanced cantilever construction.

 

Image courtesy of Pipenbaher Consulting Engineers